SIGNAL/NOISE
A power station that never switched off. 800 bodies. One turbine hall. Current flows from 23:00.
Incoming signals
Every poster is drawn by the machine from the night's name and date. Hover to scramble the transmission.
Overcurrent
Phase Inversion
Ground Loop

It still runs on current
From 1961 it fed the east side of the city. Two turbines, three shifts, a hum you could feel from the tram stop.
In 1994 they cut the load. The hall went dark. Pigeons, rust, the odd trespasser with a torch.
We found the switchboard still wired. We added a sound system, not a renovation. The building does the rest.
> Nothing was switched off. Only redirected.
sys.readoutOK
The control room
Scroll to bring the rig online. Built to be felt in the chest, not heard in the ears.
// Sound system
- Funktion-One Vero main stack, four-way active
- 48 kW across the hall, tuned to the concrete
- Dedicated sub array under the old turbine bed
- Rotary mixer + CDJ-3000 ×4, Technics ×2
// Lighting
- 32 moving heads rigged on the original crane gantry
- Six green lasers, zero colour wash
- DMX routed through the 1961 switchboard
- Lights run by hand, every night
Request access
Names in before 18:00 get reduced entry until 00:30. One plus-one. No photos on the floor.
- 01 · Guest list = €5 off door
- 02 · ID required, 18+
- 03 · Door has the final word
Follow the line
Kraftwerkstraße 14
Turbine Hall B
Entrance on the canal side
- MON–WED
- Offline
- THU
- 23:00 → 05:00
- FRI
- 23:00 → 08:00
- SAT
- 23:00 → late
- SUN
- 23:00 → 06:00
- Step 1
Exit U8 Heizwerk, rear platform, stairs B.
- Step 2
Follow the canal east under the rail bridge.
- Step 3
Left at the gas holder. Look for the green light over the door.